WhereToCut.com
Define the room. Add the boards. Create a cut plan.
Select a room shape, enter its boundary dimensions and confirm the flooring values. WhereToCut checks the room, compares both board directions and creates a traceable row, source-board and saw schedule.
Step 1
Room boundary
Room preview
N = up · E = right across the plan. These are diagram directions only, not geographic north.
- Overall width
- —
- Overall height
- —
- Area
- —
- Perimeter
- —
- Expansion gap
- —
- Board size
- —
- Edge profile
- —
- Smallest piece
- —
- Minimum width
- —
- Minimum stagger
- —
- Saw kerf
- —
WhereToCut calculation
WhereToCut calculates the optimal layout for both board directions and returns a complete cutting plan.
Verify every plan against the flooring manufacturer's installation instructions before cutting.
Recommendation
—
Selected plan
- Full boards
- —
- Installed pieces
- —
- Unused material
- —
- Unused offcuts
- —
- Total cuts
- —
- Rip distance
- —
- Narrowest width
- —
- Course-grid offset
- —
- Saw kerf
- —
- Kerf loss
- —
Installation schedule
Rows and installed boards
Rows are listed in course-progression order. Every piece refers to its source board and cut
IDs.
Installation schedule
Rows and installed boards
| Row / run | Width | Run & joints | Installed pieces | Required cuts |
|---|
Stock schedule
Full source boards
Crosscut marks are cumulative from the chosen factory end. Each shaped piece also lists its
rip, notch and reused-offcut operations.
Stock schedule
Full source boards
| Source board | Board diagram | Pieces and shaping | Cut positions | Unused material |
|---|
Saw schedule
All required cuts
Each entry includes a simple diagram showing the cut line and the side from which kerf is
consumed.
Saw schedule
All required cuts
| Cut | Diagram | Board / piece | Type | Instruction |
|---|
Contingency
Expected material remaining
Every expected remnant is listed. Pieces below 100 mm in either dimension are shown compactly without a diagram.